Chip Mill ( electrical)
Sawmill Modernization
Reclaim Conveyor
Slasher Deck Rebuild
Portal Crane Installation
Chip Screen Replacement
Wet Precipitator System
Truckwood Watering System
Optimizer System
Dryer Structural Steel
Screens
Lathe Stepfeeder
Power Studies
Cyclone Support Structure
Project Development Studies
Stacker Building Design
I. D. Fan Replacement
Cooling Water Study
Control Room Design
Condensate System
Monorail Load Rating Studies |
$3,000,000
$4,000,000
$400,000
$300,000
$225,000
$275,000
$5,000,000
$1,200,000
$3,500,000
$250,000
$300,000
$225,000
varied
$75,000
varied
$150,000
$100,000
$50,000
$50,000
$35,000
varied
|